Orsted AS (ORSTED) - Power - Deals and Alliances Profile

Region:Europe

Author(s):

Product Code:GDPE7272D

Download Sample Report download
Buy the Full ReportStarting from $250
Published on

November 2018

Total pages

430

Table of Content

Download Sample Report download
Buy the Full ReportStarting from $250

About the Report

About the Report

Summary

Orsted AS (Orsted) formerly Dong Energy A/S, is an integrated energy company that procures, produces, distributes and trades energy and energy related products. It generates electricity and heat using conventional fuel and wind energy sources. The company also develops, constructs, owns and operates offshore wind farms. Orsted also explores and produces oil and natural gas; stores natural gas; transports crude oil; and markets and sells natural gas and electricity.. The company generates and sells power and heat to residential, commercial and industrial customers in Northern Europe. Orsted is headquartered in Fredericia, Denmark.

Orsted AS (ORSTED)-Power-Deals and Alliances Profile provides you comprehensive data and trend analysis of the company's Mergers and Acquisitions (M&As), partnerships and financings. The report provides detailed information on Mergers and Acquisitions, Equity/Debt Offerings, Private Equity, Venture Financing and Partnership transactions recorded by the company over a five year period. The report offers detailed comparative data on the number of deals and their value categorized into deal types, sub-sector and regions.

GlobalData derived the data presented in this report from proprietary in-house Power eTrack deals database, and primary and secondary research.

Scope

- Financial Deals-Analysis of the company's financial deals including Mergers and Acquisitions, Equity/Debt Offerings, Private Equity, Venture Financing and Partnerships.

- Deals by Year-Chart and table displaying information encompassing the number of deals and value reported by the company by year, for a five year period.

- Deals by Type-Chart and table depicting information including the number of deals and value reported by the company by type such as Mergers and Acquisitions, Equity/Debt Offering etc.

- Deals by Region-Chart and table presenting information on the number of deals and value reported by the company by region, which includes North America, Europe, Asia Pacific, the Middle East and Africa and South and Central America.

- Deals by Sub-sector-Chart and table showing information on the number of deals and value reported by the company, by sub-sector.

- Major Deals-Information on the company's major financial deals. Each such deal has a brief summary, deal type, deal rationale; and deal financials and target Company's (major public companies) key financial metrics and ratios.

- Business Description-A brief description of the company's operations.

- Key Employees-A list of the key executives of the company.

- Important Locations and Subsidiaries-A list and contact details of key centers of operation and subsidiaries of the company.

- Key Competitors-A list of the key competitors of the company.

- Key Recent Developments-A brief on recent news about the company.

Reasons to Buy

Get detailed information on the company's financial deals that enable you to understand the company's expansion/divestiture and fund requirements

- The profile enables you to analyze the company's financial deals by region, by year, by business segments and by type, for a five year period.

Understand the company's business segments' expansion / divestiture strategy

- The profile presents deals from the company's core business segments' perspective to help you understand its corporate strategy.

Access elaborate information on the company's recent financial deals that enable you to understand the key deals which have shaped the company

- Detailed information on major recent deals includes a summary of each deal, deal type, deal rationale, deal financials and Target Company's key financial metrics and ratios.

Equip yourself with detailed information about the company's operations to identify potential customers and suppliers.

- The profile analyzes the company's business structure, locations and subsidiaries, key executives and key competitors.

Stay up-to-date on the major developments affecting the company

- Recent developments concerning the company presented in the profile help you track important events.

Gain key insights into the company for academic or business research

- Key elements such as break up of deals into categories and information on detailed major deals are incorporated into the profile to assist your academic or business research needs.

Note*: Some sections may be missing if data is unavailable for the company.

Products

Products

Orsted AS, Deal Analysis, Mergers, Acquisitions, Asset Purchases, Asset Divestitures, Company Divestitures, Equity Offerings, Capital Raising, Debt Offerings, IPOs, Initial Public Offering, Private Placement, Private Investment In Public Equities, Secondary Offerings, Follow-On Offerings, Debt Private Placement, Public Debt Placement, Partnerships, Joint Venture, Licensing Agreements, Co-Marketing Agreements, Upfront Payment, Milestone Payment, Phases, Clinical Trials, Private Equity, Venture Capital, PE,VC, Asset Finance, Project Finance, Tax Equity Financing, Bond Financing, Lease Financing, New Build Financing, Deal Analysis By Market/sector, Deal Analysis By Geography, Deal Analysis By Deal Types, Key Employees, Locations And Subsidiaries, Competitors, Recent News, Company Overview, Key Facts, Deals By Year, Deal Details, Recent Developments, Significant Developments.

Table of Contents

Table of Contents

Table of Contents

Table of Contents 3

List of Tables 11

List of Figures 12

Orsted AS, Power, Deals By Year, 2012 to YTD 2018 13

Orsted AS, Power Deals By Type, 2012 to YTD 2018 14

Orsted AS, Power, Deals By Region, 2012 to YTD 2018 15

Orsted AS, Power, Deals By Sector, 2012 to YTD 2018 16

Orsted AS, Power, Deals Summary, 2012 to YTD 2018 17

Orsted AS, Power, Deal Details 21

Asset Purchase 21

Macquarie Capital and DONG Energy to Acquire 85% Stake in Formosa 1 Offshore Wind Power Project in Miaoli County, Taiwan from Swancor Renewable Energy 21

Orsted Plans to Invest USD12.97 Billion in Four Offshore Wind Farms in Taiwan 22

DONG Energy Acquires Offshore Wind Development Lease in New Jersey, US from RES America Developments 23

DONG Energy to Acquire Offshore Wind Development Project in Massachusetts, US from RES America Developments 24

Dong Energy Acquires Remaining 66.66% Stake in Hornsea Project One Offshore Wind Power Project in Yorkshire, UK from SMart Wind 25

DONG Energy Acquires Remaining 50% Interest in Barrow Offshore Wind Power Project in England, UK from Centrica for USD78 Million 26

DONG Energy Acquires Borkum Riffgrund West II Offshore Wind Power Project in Germany from Energiekontor 27

Dong E&P Acquires Race Bank Offshore Wind Farm Project In UK From Centrica RBW For USD 82 Million 28

DONG Energy Acquires Remaining 50% Stakes In Three Offshore Wind Projects In Denmark From SSE For USD 23.4 Million 29

DONG Energy Acquires 100% Stake In Portfolio Of Wind Farms From PNE Wind In Germany 30

DONG Energy To Acquire Centrica Energy Renewable Investments From Centrica For USD 63.5 Million 32

Dong Energy Invests USD 1.6 Billion In Walney Wind Power Project In England, UK 33

Orsted, Swancor Renewable Energy and Macquarie Capital Complete Project Financing of USD628.5 Million for Phase II of Formosa 1 Offshore Wind Farm in Taiwan 34

Dong Energy and ScottishPower Completes Project Financing of USD531.6 Billion for West of Duddon Sands Wind Project in Cumbria, UK 36

DONG Energy Receives Grant Of USD 1.7 Million For Westermost Rough Wind Project In UK 37

Partnerships 38

Semcon To Form Partnership with DONG Energy 38

Dong Energy, E.ON And Strabag International Forms Joint venture 39

DONG Energy Enters Into Partnership With EuroSite Power 40

Equity Offering 41

DONG Energy to Raise USD679.1 Million in Public Offering of Shares 41

DONG Energy to Raise USD388.3 Million in Public Offering of Shares 42

DONG Energy Prices Secondary Offering of Shares for USD941.2 Million 43

Dong Energy Completes Underwriter's Exercise of Over-Allotment Option of IPO for USD2.95 Billion 44

Dong Energy Completes Private Placement Of Shares For USD 2.37 Billion 46

Debt Offering 48

Orsted Plans to Raise Funds through Private Placement of Bonds 48

Orsted Raises USD885.4 Million in Public Offering of 1.5% Green Senior Bonds Due 2029 49

Orsted to Raise USD590.3 Million in Public Offering of Green Hybrid Capital Securities Due 3017 50

Dong Energy Raises USD565.5 Million in Public Offering of 4% Bonds Due 2016 51

Dong Energy Raises USD565.5 Million in Public Offering of 6.5% Bonds Due 2019 52

Dong Energy Raises USD848.2 Million in Public Offering of 2.625% Bonds Due 2022 53

Dong Energy Raises USD565.5 Million in Public Offering of 4.875% Bonds Due 2021 54

DONG Energy Completes Public Offering Of Securities, Due 3015 For USD 655 Million 55

Dong Energy Completes Public Offering Of 2.625% Bonds Due 2022 For USD 961 Million 56

DONG Energy Competes Public Offering Of 4.875% Bonds Due 2032 For USD 1.17 Billion 57

Asset Transactions 58

Global Infrastructure Partners Announces Project Financing of USD4.6 Billion for Acquisition of 50% Interest in Hornsea One Offshore Wind Project in Yorkshire, UK from Orsted for USD5.86 Billion 58

Castleton Commodities International Completes Acquisition of 50% Stake in Enecogen Power Plant in Rotterdam, The Netherlands from Orsted 59

Orsted Plans to Sell Danish Power Distribution and Residential Customer Businesses 60

Pensionskassernes Administration and PFA Pension Completes Bond Financing of USD694.2 Million for Acquisition of 50% Stake in Walney Extension Offshore Wind Farm in UK from Orsted for USD2.63 Billion 61

Global Infrastructure Partners Completes Bond Financing of USD980 Million for Acquisition of 50% Stake in Borkum Riffgrund 2 Offshore Wind Farm in Germany from DONG Energy for USD1.37 Billion 63

Pensionskassernes Administration and PFA Pension Completes Project Financing of USD395.2 Million for Acquisition of 50% Stake in Walney Extension Offshore Wind Farm in UK from Orsted for USD2.63 Billion 64

Macquarie European Infrastructure Fund and Macquarie Capital Group to Acquire 50% Stake in Race Bank Offshore Wind Farm in England, UK from DONG Energy 66

Eversource Energy Acquires 50% Interest in Bay State Offshore Wind Farm in Massachusetts, US from Dong Energy 67

Pensionskassernes Administration and Kirkbi Acquire 50% Stake in Burbo Bank Extension Offshore Wind Farm Project in UK from DONG Energy for USD952.7 Million 68

TC Westermost Rough OFTO to Acquire Transmission Assets in UK from Westermost Rough 69

Global Infrastructure Announces Bond Financing of USD621.3 Million for Acquisition of 50% Interest in Gode Wind 1 Offshore Wind Farm Project in Germany from DONG Energy 70

Struer Forsyning Fjernvarme And Vestforsyning Varme to Acquire Mabjerg CHP Plant in Denmark from DONG Energy 71

Prime Super Completes Acquisition of 80% Interest in Storrun Wind Power Project in Sweden from Dong Energy 72

Romande Energie Acquires Ploudalmezeau Wind Farm in France from DONG Energy 73

Consortium of Danish Pension Funds led by Pensionskassernes Administration Acquired 50% Interest in Gode Wind 2 Offshore Wind Power Project from Dong Energy for USD812 million 74

UK Green Investment Bank And Marubeni Acquire 50% Interest In Westermost Rough Offshore Wind Farm In UK From Dong Energy For USD 831.8 Million 75

Caisse de Depot To Acquire 25% Stake In London Array I Wind Farm In UK From Dong Energy For USD 1.06 Billion 76

Statoil To Acquire Mongstad Gas Fired Power Plant In Norway From Dong Energy For USD 296 Million 77

PGE And Energa Acquires Wind Power Assets From Dong Energy For USD217.5 Million 78

Dong Energy To Sell OnShore Wind Business To Syd Energi And PFA Pension For USD 133.7 Million 79

DONG Energy Plans To Sell Portfolio Of Wind Farms In Poland 80

KIRKBI And William Demant Acquires 50% Interest In Borkum Riffgrund 1 Wind Power Project From Dong Energy For USD 836.5 Million 81

Marubeni Completes Project Financing For Acquisition Of 49.9% Stake In Gunfleet Sands Offshore Wind Power Project From Dong Energy 82

Acquisition 83

Orsted to Acquire Deepwater Wind from D E Shaw for USD510 Million 83

Orsted Acquires Lincoln Clean Energy from I Squared Capital 84

GeoSea Acquires A2SEA from DONG Energy and Siemens Wind Power 85

Eneco To Acquire DONG Energy Sales From DONG Energy 86

Vardar Boreas Acquired 33% Stake In Kvalheim Kraft From Dong Energy 87

Orsted AS-Key Competitors 88

Orsted AS-Key Employees 89

Orsted AS-Locations And Subsidiaries 90

Head Office 90

Other Locations & Subsidiaries 90

Joint Venture 92

Recent Developments 94

Nov 02, 2018: Orsted's wind projects spur 14% rise in Q3 earnings 94

Oct 28, 2018: Plans for Manx wind farm progressing 95

Oct 25, 2018: VolkerInfra signs multi-million-pound contract with Orsted 96

Oct 23, 2018: Orsted selects SGRE as top choice for 900MW Taiwanese wind farms 97

Oct 16, 2018: Borssele 1&2 berths for GeoSea, Van Oord 98

Oct 16, 2018: TenneT ends contract with mast builders, delaying Dutch power line 99

Oct 16, 2018: Orsted selects GeoSea for Borssele 1 & 2 foundation and turbine transport and installation 100

Oct 15, 2018: Orsted and NaiKun not to proceed with JDA 101

Oct 12, 2018: Orsted signs a pin-piles manufacturing contract with Formosa Heavy Industries 102

Oct 08, 2018: Orsted's gets approval for Race Bank Extension wind farm 103

Oct 06, 2018: Launching of WIND OF CHANGE 104

Oct 04, 2018: Waves Group supplying marine warranty services to World's largest offshore wind farm – Hornsea Project One 105

Sep 27, 2018: DNV GL supports Orsted as lenders' technical advisor to the 1.2 GW Hornsea Project One offshore wind farm 106

Sep 27, 2018: Orsted encourages UK suppliers to “grasp opportunity” from world's biggest offshore wind farm 107

Sep 21, 2018: AMG Superalloys enters into multi-year agreement with Orsted 108

Sep 20, 2018: Orsted to sell 50% stake of Hornsea 1 offshore windfarm for $5.8bn 109

Sep 14, 2018: Seaproof Signs Frame Agreement with Orsted for CPS 110

Sep 12, 2018: Edda Mistral pops to Grimsby, before joining her sister out at sea 111

Sep 06, 2018: World's largest offshore windfarm opens off Cumbrian coast 112

Sep 04, 2018: Final turbine installed at Borkum Riffgrund 2 offshore wind farm in Germany 113

Sep 04, 2018: Orsted signs PPA with innogy for Triton Knoll offshore wind farm in UK 114

Sep 04, 2018: Trelleborg and Orsted sign long term wind farm cable protection agreement 115

Sep 04, 2018: NKT finalizes cable system delivery to offshore wind park Walney Extension in the UK 116

Sep 04, 2018: Green light for Hornsea 2 tweak 117

Aug 31, 2018: Energy from offshore wind turbines could land at Camp Pendleton in Virginia Beach 118

Aug 30, 2018: JDR Cables wins multi-million pound contract for Hornsea Project Two offshore wind farm 119

Aug 25, 2018: Orsted and WWF join forces to protect the planet 120

Aug 23, 2018: Extension of charter contract for the vessel “Connector” 121

Aug 22, 2018: MMT signs 10 new contracts 122

Aug 22, 2018: SeaRoc Group installs communications solution on world's first offshore reactive compensation station at Hornsea Project One 123

Aug 22, 2018: Fuel-efficient Sea Puffin 1 pushes-on in 1.5 m significant wave height 124

Aug 22, 2018: 20 Suction bucket jackets successfully installed at Borkum Riffgrund 2 125

Aug 20, 2018: Carbon Trust Offshore Wind Accelerator announces successful execution of offshore test of innovative new installation technology to reduce underwater noise and costs 127

Aug 20, 2018: CUEL signs first offshore wind contract with Jan De Nul Group 128

Aug 14, 2018: Balfour Beatty to build onshore substation for Orsted's Hornsea Project Two 129

Aug 14, 2018: Orsted adds legal interest 130

Aug 13, 2018: Wind farm Giant Orsted appoints Pinsent Masons to German legal panel 131

Aug 10, 2018: UK crew wraps up Orsted tour 132

Aug 10, 2018: HBC has completed the Orsted Subsea Inspection Campaign 2018 133

Aug 09, 2018: Interim report for first half-year 2018: Strong results and continued strategic progress 134

Aug 09, 2018: Siemens Gamesa receives offshore wind turbine contract from Orsted 135

Aug 09, 2018: Interim report for the first half of 2018: Strong result and continued strategic progress 136

Aug 08, 2018: Wind turbines anchored at Orsted's Burkum Riffgrund 2 farm 138

Aug 07, 2018: Scots bed down at Riffgrund 2 139

Aug 06, 2018: Offshore wind farm Borkum Riffgrund 2 produces electricity for the first time: Orsted 140

Aug 03, 2018: Prysmian to supply inter-array cables for Hornsea Project Two 141

Aug 03, 2018: Dominion Energy, Orsted advance offshore wind development 142

Aug 02, 2018: Multi-million pound offshore wind cable contract sparks investment in Wrexham facility 143

Jul 31, 2018: Last Suction Bucket Jacket foundations installed in Borkum Riffgrund 2 offshore wind farm 144

Jul 30, 2018: The last two offshore substation topsides have just left Bladt 145

Jul 23, 2018: UK offshore wind capacity set to double following government announcement 146

Jul 20, 2018: SkySpecs and Orsted to perform robotic inspection on Burbo Bank wind farm 147

Jul 19, 2018: Nexus Installing Final Batch of Borkum Riffgrund 2 Cables 148

Jul 18, 2018: Controversial off-shore wind farm plans spark heated debate in Holt 149

Jul 17, 2018: Offshore Wind Project Launches Research Buoy Off Coast of A.C. 150

Jul 16, 2018: Orsted Launches AXYS Technologies' FLiDAR Buoy to Assess Offshore Conditions for Ocean Wind Project in New Jersey 151

Jul 12, 2018: ABB secures $150m order from Orsted for Hornsea Project Two 152

Jul 12, 2018: Orsted selects Tekmar Energy for Borssele I&II along with a 6 year framework 153

Jul 12, 2018: New Orsted survey reveals 73% of UK consumers would choose retailers that use renewable energy 154

Jul 06, 2018: Fugro returns to Orsted's Hornsea offshore wind farm sites for geotechnical site investigation 155

Jul 05, 2018: Norfolk MP to host public off-shore wind farm meeting 156

Jul 04, 2018: NKT awarded Hornsea 2 offshore AC cable project 157

Jul 02, 2018: Green light for Orsted O&M base in Vlissingen 158

Jun 29, 2018: Orsted places order for Hornsea Project Two offshore windfarm 159

Jun 29, 2018: World's first offshore Reactive Compensation Station installed for Hornsea Project One 160

Jun 29, 2018: Clifford Chance acts on landmark offshore wind farm 161

Jun 28, 2018: Successful installation of three HVAC export cables in German waters 162

Jun 26, 2018: Orsted wins 920MW offshore wind projects in Taiwan 163

Jun 26, 2018: Global leader in offshore wind extends partnership with Barrow RNLI 164

Jun 26, 2018: Offshore substation installed for the Borkum Riffgrund 2 wind farm 165

Jun 25, 2018: Topside touchdown at Riffgrund 2 166

Jun 22, 2018: Survitec supplies new suit to Orsted 167

Jun 20, 2018: Aggregate Industries and Open Energi partner to deliver UK first rollout of AI-powered flexibility platform 168

Jun 20, 2018: New construction inaugurated for Orsted's operations management center in Norddeich 169

Jun 19, 2018: Orsted announces latest round of grants for community projects around Liverpool Bay 170

Jun 18, 2018: Eastern Denmarks Biggest Biogas Plant Ready For Commissioning 172

Jun 16, 2018: The last 1400 tons of steel left Szczecin 173

Jun 13, 2018: Race Bank Offshore Wind Farm officially opens 174

Jun 04, 2018: Riffgrund 2 wears first jacket 175

May 29, 2018: Riffgrund 2 preps topside tilt 176

May 22, 2018: Orsted and Milton Abbey agree partnership to optimise schools energy use 177

May 22, 2018: New algorithms can save wind turbine owners DKK millions 178

May 18, 2018: Orsted opens Atlantic City shop 179

May 07, 2018: Germans enter 8MW territory 180

May 07, 2018: Borkum Riffgrund 2: First 8-megawatt turbine successfully installed in the German North Sea 181

May 03, 2018: Turbines sail to Riffgrund 2 182

May 01, 2018: Osbit delivers industry-first jack-up vessel boat landing system for GMS Endeavour 183

Apr 30, 2018: Taiwan awards Orsted 900MW grid capacity for offshore wind 184

Apr 30, 2018: German offshore wind auction strengthens case for accelerated build-out 185

Apr 30, 2018: Delivering Solar for Northumbrian Water 186

Apr 27, 2018: Orsted wins 551.75MW in German offshore wind power auction 187

Apr 26, 2018: Interim report for Q1 2018: Orsted A/S 188

Apr 26, 2018: Orsted commits to invest in the second phase of Taiwans Formosa 1 offshore wind farm 189

Apr 25, 2018: Orsted to build 20MW battery storage in UK 190

Apr 25, 2018: NEC to Supply 20 MW Energy Storage System to Orsted UK 191

Apr 24, 2018: Final turbines installed at world's largest offshore wind farm 192

Apr 23, 2018: Hornsea One Jacket Up 193

Apr 18, 2018: First offshore export cable section laid at Hornsea Project One 194

Apr 13, 2018: Louis Dreyfus Armateurs and Orsted reinforce their partnership in the Renewable Energy sector 195

Apr 11, 2018: Hornsea 1 jackets ready to fit 196

Apr 11, 2018: Spectrum Offshore have been awarded a contract by Orsted on Hornsea Project One Offshore Wind Farm 197

Apr 11, 2018: Floating wind joint industry partnership to tackle dynamic export cables and asset integrity 198

Apr 10, 2018: Danish Fossil Company Transforms into Offshore Wind Powerhouse 199

Apr 05, 2018: Northumbrian Water goes 100% renewable following green electricity deal 200

Apr 04, 2018: Wind energy firm Orsted to open Atlantic City office 201

Apr 04, 2018: Governor Murphy Announces That Orsted Will Establish Atlantic City Office and Begin Local Hiring 202

Apr 03, 2018: Siemens Gamesa wins contract for expansion of Formosa 1 offshore wind power plant 203

Apr 03, 2018: Bay State Wind Brings New Steel Facility and Manufacturing Capabilities to Massachusetts 204

Mar 20, 2018: Bladt Industries and Century Wind Power wins a contract from Orsted in Taiwan 205

Mar 16, 2018: Orsted signed contract with CWP to supply jacket foundation transition piece mock-up 206

Mar 14, 2018: Bay State Wind, the first offshore wind project to be granted ‘FAST-41' designation 207

Mar 13, 2018: London Array braced for blade fix 208

Mar 13, 2018: Carbon Trust Offshore Wind Accelerator launches new project to reduce costs and underwater noise in offshore wind construction 209

Mar 12, 2018: Orsted hunts UXO off Asia, US 211

Mar 12, 2018: Fifth pontoon for marine designs in Barrow 212

Mar 09, 2018: Riffgrund 2 takes flight 213

Mar 07, 2018: Orsted well positioned to fund all four Greater Changhua projects 214

Mar 05, 2018: Major green investment in Herning Power Station now launched 215

Mar 05, 2018: Riffgrund 2 crosses start line 216

Mar 02, 2018: Cuxport handles special offshore wind foundations for Borkum Riffgrund 2 217

Mar 01, 2018: Joint industry project to investigate next generation turbines and heavy lifts for floating wind farms 218

Feb 28, 2018: Employee representatives elected to the Board of Directors of Orsted 219

Feb 23, 2018: irst transport with ST3 Offshore's jackets on the way to Cuxhaven 220

Feb 21, 2018: Jackets from the second ST3 Offshore's project on the way from Szczecin (Poland) to Orsted 221

Feb 20, 2018: Orsted appoint Daniel Lerup as Head of Investor Relations 222

Feb 19, 2018: Hornsea 1 engagement party 223

Feb 15, 2018: Orsted and University of Oxford sign five-year agreement to optimise wind turbine foundations 224

Feb 14, 2018: Siemens Gamesa awarded contract from Orsted to supply 1,386 MW of wind turbines for the Hornsea project 225

Feb 13, 2018: Hobson & Porter to build O&M hub for Orsted's offshore wind farm in Grimsby 226

Feb 12, 2018: Hornsea Project Three offshore wind farm publishes updated plans 227

Feb 09, 2018: Offshore wind farm vessel contract won by team that brought firsts to the town 228

Feb 07, 2018: Uncovering Lincolnshire's Past 229

Feb 06, 2018: Hornsea 1 treasures revealed 231

Feb 03, 2018: Double naming ceremony 232

Feb 01, 2018: Orsted launches a BIG recruitment drive for wind turbine technicians in Grimsby-head for heights required! 233

Feb 01, 2018: Orsted approves the annual report for 2017 234

Feb 01, 2018: Full power at Race Bank Offshore Wind Farm: Orsted 236

Jan 26, 2018: Orsted begins offshore construction for Hornsea Project One 237

Jan 24, 2018: CHC completes first flight for Orsted's Hornsea Project One 238

Jan 23, 2018: First monopiles sail to Hornsea 1 239

Jan 22, 2018: Power generated from final phase of Orsted's Walney Extension Wind Farm 240

Jan 19, 2018: Companies plan to test innovative wind energy technology in the North Sea 241

Jan 17, 2018: ST3 renegotiated terms of contract with Orsted 242

Jan 09, 2018: Orsted Testing Hybrid CTV at Horns Rev 2 243

Jan 08, 2018: Changes in Orsted Executive Committee 244

Jan 05, 2018: Orsted allies with National Kaohsiung University of Science and Technology 245

Dec 25, 2017: Orsted Wraps Up Hornsea Three Cable Corridor Talks 246

Dec 21, 2017: Orsted announces latest round of grants for community projects around Liverpool Bay 247

Dec 20, 2017: Bay State Wind submits bid to build Massachusetts' first offshore wind farm 248

Dec 19, 2017: Siemens Convergence Creators to deliver communication subsystems for Orsted wind farms 249

Dec 18, 2017: Orsted installs final wind turbine at Race Bank offshore wind farm 250

Dec 14, 2017: Offshore white noise 'shields' whales 251

Dec 06, 2017: Orsted clears Taiwan hurdle 252

Dec 04, 2017: Semco Maritime wins engineering contract for Orsted's Hornsea Project Two Offshore Wind Farm 253

Dec 01, 2017: Fugro secures Orsted contracts for site investigations at US offshore wind projects 254

Nov 30, 2017: Lewek Connector: Short-term charter contract 255

Nov 29, 2017: Carlsberg launches 100% biogas powered brewery in Sweden 256

Nov 28, 2017: Seven wind farms win initial okay 257

Nov 28, 2017: Orsted to premiere giant rotor at Dutch offshore wind farm 258

Nov 28, 2017: Hornsea seconds for TP two 259

Nov 28, 2017: Bay State opens public doors 260

Nov 27, 2017: Orsted books UK bright sparks 261

Nov 24, 2017: OSB fits first Hornsea 1 platform 262

Nov 24, 2017: Major Contract Win at World's Biggest Offshore Wind Farm 263

Nov 22, 2017: Orsted Yet to Decide on Bidding for Hollandse Kust I & II. Highlights Different Conditions in Germany and the Netherlands 264

Nov 21, 2017: Spotlight on Hornsea 3 265

Nov 17, 2017: Orsted Opens Geotechnical Investigation Qualifiers 266

Nov 16, 2017: Community Fund Awards Second Round of Grants 267

Nov 16, 2017: Principle Power Makes Floating Wind Pitch in Massachusetts 268

Nov 15, 2017: Bureau Veritas on point for Orsted 269

Nov 13, 2017: Orsted to Compete for Hollandse Kust Zuid I and II 270

Nov 13, 2017: Borssele 1&2 seeks cable guys 271

Nov 09, 2017: The Danes start to build a biomass-fired power station driven by a turbine from Pilsen 272

Nov 08, 2017: Orsted smooths geophys selection 273

Nov 08, 2017: MH-O&Co to Supply Three Crew Transfer Vessels for Hornsea Project One 274

Nov 02, 2017: Saipem confirms Hornsea gig 275

Oct 31, 2017: Borssele 1&2 calls for certifiers 276

Oct 30, 2017: Decisions from the extraordinary general meeting: DONG Energy A/S 277

Oct 30, 2017: Dong Energy selects ESVAGT as partner for Hornsea 1 278

Oct 30, 2017: Borssele Wind Could Power Corporations 279

Oct 30, 2017: Huge conversion project in Kalundborg initiated 280

Oct 26, 2017: Top four trends from the third quarter 281

Oct 26, 2017: Final turbines installed ahead of schedule on Borkum Riffgrund 2 282

Oct 25, 2017: HRH The Crown Princess inaugurates Skarbak Power Station 283

Oct 24, 2017: DeepOcean Puts Echoscope to Work at Race Bank Offshore Wind Farm 284

Oct 24, 2017: Jones Bros delivers infrastructure for Walney Extension wind farm 285

Oct 19, 2017: US wind farm jobs to Aqualis Offshore 286

Oct 13, 2017: DONG Energy signs innovative agreement with Gas Power Developments 287

Oct 09, 2017: Installation and trenching of 91 Inter Array Cables at DONG Energy's Race Bank Offshore Windfarm site successfully completed 288

Oct 05, 2017: Offshore wind substation specialist Semco drops anchor in Grimsby 289

Oct 04, 2017: X-Wind Power in Sandwich in administration three years after receiving £1m loan from Kent County Council 290

Oct 03, 2017: Humber to host UK centre of excellence for offshore wind operations and maintenance 291

Oct 03, 2017: Zbridge W2W System Supporting Race Bank Ops 293

Oct 03, 2017: AW169 obtains first Danish order and enters UK's wind farm support market 294

Oct 03, 2017: Robertson FM powers forward with DONG Energy deal 295

Oct 02, 2017: Dong Energy changes name to Orsted 296

Sep 29, 2017: Dong awards offshore wind contracts 297

Sep 27, 2017: DONG to use BMO vessel motion monitoring systems 298

Sep 27, 2017: Con4Mare provides Marine Warranty Survey Services for the Hornsea One Project 299

Sep 26, 2017: Spotlight on UK offshore costs 300

Sep 25, 2017: Dong seeks cloud cover 301

Sep 21, 2017: MAN GenSets Chosen for Wind Service Application 302

Sep 21, 2017: CS Wind UK Paints First Offshore Wind Tower Section 303

Sep 21, 2017: VOS Start at work in Irish Sea 304

Sep 20, 2017: CHC Wins Aviation Contract for DONG Energy Hornsea Project One 305

Sep 19, 2017: Ecosse Subsea Systems Scoop Seabed Project On World's Largest Offshore Wind Farm 306

Sep 15, 2017: SAL to soldier on offshore 307

Sep 15, 2017: MHI Vestas adds keep-fit kit 308

Sep 15, 2017: DONG Energy Wind Power Awards Frame Agreement to ISC 309

Sep 14, 2017: CS Wind toasts UK offshore first 310

Sep 13, 2017: DONG Energy signs LOI with NaiKun Wind Energy for Haida Energy Field Offshore Wind Project 311


List of Figure

List of Figures

Orsted AS, Power, Deals by Type, 2012 to YTD 2018 2

Orsted AS, Power, Deals By Year, 2012 to YTD 2018 2

Orsted AS, Power, Deals By Region, 2012 to YTD 2018 2

Orsted AS, Power, Deals By Sector, 2012 to YTD 2018 2

Orsted AS, Power, Deals By Year, 2012 to YTD 2018 14

Orsted AS, Power, Deals by Type, 2012 to YTD 2018 15

Orsted AS, Power, Deals By Region, 2012 to YTD 2018 16

Orsted AS, Power, Deals by Sector, 2012 to YTD 2018 17


List of Table

List of Tables

Orsted AS, Power, Key Facts, 2017 2

Orsted AS, Power, Deals Summary, 2012 to YTD 2018 2

Orsted AS, Power, Deals By Year, 2012 to YTD 2018 14

Orsted AS, Power Deals By Type, 2012 to YTD 2018 15

Orsted AS, Power, Deals By Region, 2012 to YTD 2018 16

Orsted AS, Deals By Sector, 2012 to YTD 2018 17

Orsted AS, Power, Deals Summary, 2012 to YTD 2018 18

Macquarie Capital and DONG Energy to Acquire 85% Stake in Formosa 1 Offshore Wind Power Project in Miaoli County, Taiwan from Swancor Renewable Energy 22

Orsted Plans to Invest USD12.97 Billion in Four Offshore Wind Farms in Taiwan 23

DONG Energy Acquires Offshore Wind Development Lease in New Jersey, US from RES America Developments 24

DONG Energy to Acquire Offshore Wind Development Project in Massachusetts, US from RES America Developments 25

Dong Energy Acquires Remaining 66.66% Stake in Hornsea Project One Offshore Wind Power Project in Yorkshire, UK from SMart Wind 26

DONG Energy Acquires Remaining 50% Interest in Barrow Offshore Wind Power Project in England, UK from Centrica for USD78 Million 27

DONG Energy Acquires Borkum Riffgrund West II Offshore Wind Power Project in Germany from Energiekontor 28

Dong E&P Acquires Race Bank Offshore Wind Farm Project In UK From Centrica RBW For USD 82 Million 29

DONG Energy Acquires Remaining 50% Stakes In Three Offshore Wind Projects In Denmark From SSE For USD 23.4 Million 30

DONG Energy Acquires 100% Stake In Portfolio Of Wind Farms From PNE Wind In Germany 31

DONG Energy To Acquire Centrica Energy Renewable Investments From Centrica For USD 63.5 Million 33

Dong Energy Invests USD 1.6 Billion In Walney Wind Power Project In England, UK 34

Orsted, Swancor Renewable Energy and Macquarie Capital Complete Project Financing of USD628.5 Million for Phase II of Formosa 1 Offshore Wind Farm in Taiwan 35

Dong Energy and ScottishPower Completes Project Financing of USD531.6 Billion for West of Duddon Sands Wind Project in Cumbria, UK 37

DONG Energy Receives Grant Of USD 1.7 Million For Westermost Rough Wind Project In UK 38

Semcon To Form Partnership with DONG Energy 39

Dong Energy, E.ON And Strabag International Forms Joint venture 40

DONG Energy Enters Into Partnership With EuroSite Power 41

DONG Energy to Raise USD679.1 Million in Public Offering of Shares 42

DONG Energy to Raise USD388.3 Million in Public Offering of Shares 43

DONG Energy Prices Secondary Offering of Shares for USD941.2 Million 44

Dong Energy Completes Underwriter's Exercise of Over-Allotment Option of IPO for USD2.95 Billion 45

Dong Energy Completes Private Placement Of Shares For USD 2.37 Billion 47

Orsted Plans to Raise Funds through Private Placement of Bonds 49

Orsted Raises USD885.4 Million in Public Offering of 1.5% Green Senior Bonds Due 2029 50

Orsted to Raise USD590.3 Million in Public Offering of Green Hybrid Capital Securities Due 3017 51

Dong Energy Raises USD565.5 Million in Public Offering of 4% Bonds Due 2016 52

Dong Energy Raises USD565.5 Million in Public Offering of 6.5% Bonds Due 2019 53

Dong Energy Raises USD848.2 Million in Public Offering of 2.625% Bonds Due 2022 54

Dong Energy Raises USD565.5 Million in Public Offering of 4.875% Bonds Due 2021 55

DONG Energy Completes Public Offering Of Securities, Due 3015 For USD 655 Million 56

Dong Energy Completes Public Offering Of 2.625% Bonds Due 2022 For USD 961 Million 57

DONG Energy Competes Public Offering Of 4.875% Bonds Due 2032 For USD 1.17 Billion 58

Global Infrastructure Partners Announces Project Financing of USD4.6 Billion for Acquisition of 50% Interest in Hornsea One Offshore Wind Project in Yorkshire, UK from Orsted for USD5.86 Billion 59

Castleton Commodities International Completes Acquisition of 50% Stake in Enecogen Power Plant in Rotterdam, The Netherlands from Orsted 60

Orsted Plans to Sell Danish Power Distribution and Residential Customer Businesses 61

Pensionskassernes Administration and PFA Pension Completes Bond Financing of USD694.2 Million for Acquisition of 50% Stake in Walney Extension Offshore Wind Farm in UK from Orsted for USD2.63 Billion 62

Global Infrastructure Partners Completes Bond Financing of USD980 Million for Acquisition of 50% Stake in Borkum Riffgrund 2 Offshore Wind Farm in Germany from DONG Energy for USD1.37 Billion 64

Pensionskassernes Administration and PFA Pension Completes Project Financing of USD395.2 Million for Acquisition of 50% Stake in Walney Extension Offshore Wind Farm in UK from Orsted for USD2.63 Billion 65

Macquarie European Infrastructure Fund and Macquarie Capital Group to Acquire 50% Stake in Race Bank Offshore Wind Farm in England, UK from DONG Energy 67

Eversource Energy Acquires 50% Interest in Bay State Offshore Wind Farm in Massachusetts, US from Dong Energy 68

Pensionskassernes Administration and Kirkbi Acquire 50% Stake in Burbo Bank Extension Offshore Wind Farm Project in UK from DONG Energy for USD952.7 Million 69

TC Westermost Rough OFTO to Acquire Transmission Assets in UK from Westermost Rough 70

Global Infrastructure Announces Bond Financing of USD621.3 Million for Acquisition of 50% Interest in Gode Wind 1 Offshore Wind Farm Project in Germany from DONG Energy 71

Struer Forsyning Fjernvarme And Vestforsyning Varme to Acquire Mabjerg CHP Plant in Denmark from DONG Energy 72

Prime Super Completes Acquisition of 80% Interest in Storrun Wind Power Project in Sweden from Dong Energy 73

Romande Energie Acquires Ploudalmezeau Wind Farm in France from DONG Energy 74

Consortium of Danish Pension Funds led by Pensionskassernes Administration Acquired 50% Interest in Gode Wind 2 Offshore Wind Power Project from Dong Energy for USD812 million 75

UK Green Investment Bank And Marubeni Acquire 50% Interest In Westermost Rough Offshore Wind Farm In UK From Dong Energy For USD 831.8 Million 76

Caisse de Depot To Acquire 25% Stake In London Array I Wind Farm In UK From Dong Energy For USD 1.06 Billion 77

Statoil To Acquire Mongstad Gas Fired Power Plant In Norway From Dong Energy For USD 296 Million 78

PGE And Energa Acquires Wind Power Assets From Dong Energy For USD217.5 Million 79

Dong Energy To Sell OnShore Wind Business To Syd Energi And PFA Pension For USD 133.7 Million 80

DONG Energy Plans To Sell Portfolio Of Wind Farms In Poland 81

KIRKBI And William Demant Acquires 50% Interest In Borkum Riffgrund 1 Wind Power Project From Dong Energy For USD 836.5 Million 82

Marubeni Completes Project Financing For Acquisition Of 49.9% Stake In Gunfleet Sands Offshore Wind Power Project From Dong Energy 83

Orsted to Acquire Deepwater Wind from D E Shaw for USD510 Million 84

Orsted Acquires Lincoln Clean Energy from I Squared Capital 85

GeoSea Acquires A2SEA from DONG Energy and Siemens Wind Power 86

Eneco To Acquire DONG Energy Sales From DONG Energy 87

Vardar Boreas Acquired 33% Stake In Kvalheim Kraft From Dong Energy 88

Orsted AS, Key Competitors 89

Orsted AS, Key Employees 90

Orsted AS, Other Locations 91

Orsted AS, Subsidiaries 91

Orsted AS, Joint Venture 93

You can also purchase parts of this report.
Do you want to check out a section wise price list?
Get Price Break-up

Why Buy From US?

RRR
Refine Robust Result (RRR) Framework

What makes us stand out is that our consultants follows Robust, Refine and Result (RRR) methodology. i.e. Robust for clear definitions, approaches and sanity checking, Refine for differentiating respondents facts and opinions and Result for presenting data with story

reach
Our Reach Is Unmatched

We have set a benchmark in the industry by offering our clients with syndicated and customized market research reports featuring coverage of entire market as well as meticulous research and analyst insights.

Research
Shifting the Research Paradigm

While we don't replace traditional research, we flip the method upside down. Our dual approach of Top Bottom & Bottom Top ensures quality deliverable by not just verifying company fundamentals but also looking at the sector and macroeconomic factors.

Insite
More Insights-Better Decisions

With one step in the future, our research team constantly tries to show you the bigger picture. We help with some of the tough questions you may encounter along the way: How is the industry positioned? Best marketing channel? KPI's of competitors? By aligning every element, we help maximize success.

Trust
Transparency and Trust

Our report gives you instant access to the answers and sources that other companies might choose to hide. We elaborate each steps of research methodology we have used and showcase you the sample size to earn your trust.

support
Round the Clock Support

If you need any support, we are here! We pride ourselves on universe strength, data quality, and quick, friendly, and professional service.

Why Client Choose Us?

400000+ Reports in repository
150+ Consulting project a year
100+ Analysts
8000+ Client Queries in 2022