Project Insight-Airport Construction Projects: The Americas

Project Insight-Airport Construction Projects: The Americas


  • Products Id :- CN0036PI
  • |
  • Pages: 21
  • |
  • |
  • |
  Request for Sample Report
  Request A Quote

Executive Summary

The report provides detailed market analysis, information and insights based on almost 140 CIC projects in the Americas for 20 countries.

The report provides detailed metrics on the region's airport construction projects (as tracked by CIC) split by country, type and value.

Detailed metrics are also provided for the top 10 countries.

Summary

Timetric's Construction Intelligence Center (CIC) is currently tracking airport construction projects in the Americas with a total value of US$135.9 billion, comprising projects from the announced to execution stages. The US accounts for projects valued at US$90.4 billion, or 66.5% of the total for the region.

The top 10 countries (in terms of the value of their projects pipelines) account for 99% of the total value of airport construction projects in the Americas, with US$135.9 billion. These are, in order of project value, the US, Brazil, Mexico, Canada, Costa Rica, Peru, Chile, Colombia, Panama and Venezuela.

Scope

The report provides analysis based on CIC projects showing total project values for the Americas and analysis by stage and funding for the top 10 countries. Top project listings and top participants for the sector are also shown.

Reasons To Buy

Gain insight into the main drivers of activity and forecasts, and an understanding of key trends, analysis of projects by value for the Americas market and its main countries, enabling clients to target products and services for each type of project.

Read analysis of main project participants by value for the sector, enabling clients to target products and services for each type of project.

Access top project data with location, value, stage and start date.

Key Highlights

Projects in the execution stage have a total value of US$70.6 billion, followed by projects in pre-execution with US$32.7 billion.

Projects in the planning stage amount to US$25.4 billion, while those at the pre-planning stage (announced and study phases) have a combined value of US$7.3 billion.

Assuming all projects in the pipeline proceed as planned, total spending is set to stand at US$16.7 billion in 2018, and will rise to US$17.5 billion in 2019.



Read More



Contact Us:
Ken Research
Ankur Gupta, Head Marketing & Communications

+91-9015378249

1. Regional Overview

2. Key Operators

3. Project Analytics by Country

3.1. The US

3.2. Brazil

3.3. Mexico

3.4. Canada

3.5. Costa Rica

3.6. Peru

3.7. Chile

3.8. Colombia

3.9. Panama

3.10. Venezuela

4. Methodology

5. Disclaimer

Figure 1: The Americas-Project Pipeline, All Countries' Value by Stage (US$ million)

Figure 2: The Americas-Project Pipeline, All Countries' Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 3: The Americas-Project Pipeline, Top 10 Countries (US$ million)

Figure 4: The Americas-Project Pipeline, Top 10 Countries by Stage (US$ million)

Figure 5: The Americas-Project Pipeline, Top 10 Countries' Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 6: The Americas-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 7: The Americas-Airport Construction Project Values by Completion Year (US$ million)

Figure 8: The US-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 9: The US-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 10: The US-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 11: The US-Airport Construction Project Values by Completion Year (US$ million)

Figure 12: Brazil-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 13: Brazil-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 14: Brazil-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 15: Brazil-Airport Construction Project Values by Completion Year (US$ million)

Figure 16: Mexico-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 17: Mexico-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 18: Mexico-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 19: Mexico-Airport Construction Project Values by Completion Year (US$ million)

Figure 20: Canada-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 21: Canada-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 22: Canada-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 23: Canada-Airport Construction Project Values by Completion Year (US$ million)

Figure 24: Costa Rica-Airport-Construction Projects Pipeline, Value by Stage (US$ million)

Figure 25: Costa Rica-Airport-Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 26: Costa Rica-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 27: Costa Rica-Airport Construction Project Values by Completion Year (US$ million)

Figure 28: Peru-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 29: Peru-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 30: Peru-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 31: Peru-Airport Construction Project Values by Completion Year (US$ million)

Figure 32: Chile-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 33: Chile-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 34: Chile-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 35: Chile-Airport, Construction Project Values by Completion Year (US$ million)

Figure 36: Colombia-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 37: Colombia-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 38: Colombia-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 39: Colombia-Airport Construction Project Values by Completion Year (US$ million)

Figure 40: Panama-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 41: Panama-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 42: Panama-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 43: Panama-Airport Construction Project Values by Completion Year (US$ million)

Figure 44: Venezuela-Airport Construction Projects Pipeline, Value by Stage (US$ million)

Figure 45: Venezuela-Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)

Figure 46: Venezuela-Airport Construction Projects by Funding Mode (% of Total Pipeline Value)

Figure 47: Venezuela-Airport Construction Project Values by Completion Year (US$ million)

Table 1: The Americas-Project Pipeline, Value by Country and Stage (US$ million)

Table 2: Top 50 Projects by Value

Table 3: Key Contractors-Value of Projects

Table 4: Key Consulting Engineers-Value of Projects

Table 5: Key Project Owners-Value of Projects

Single User License:
The report will be emailed to you. The report is sent in PDF format, allowing one specific user access to the product.

Site Licence:
The report will be emailed to you. The report is sent in PDF format, allowing all users within a given geographical location of your organisation access to the product.

Corporate User License:
The report will be emailed to you. The report is sent in PDF format, allowing all employees within your organisation access to the product.

To know more information on Purchase by Section, please send a mail to sales [@] kenresearch.com
 

select a license

Single User License
USD 1950 INR 131528
Site License
USD 3900 INR 263055
Corporate User License
USD 5850 INR 394583

NEWSLETTER BY CATEGORY




Testimonials

An excellent provider. Thorough, precise and outstanding insight. They drill down to what we need and their reports are effective at integrating text with supporting graphics and charts. Their reports are a great resource to go back too. ...

Coherent, high-quality, thoroughly-researched reports. We received a very quick response to all our queries which eventually expedited the entire process....

Well structured, the insights they shared with us were very helpful and reliable. Their timely assistance make their services invaluable to us. I would highly recommend them and would definitely use them again in the future if needed...

The report sent to us was on the point, and its information was quite extensive, well structured, and well researched. More importantly what we valued was your response time and professionalism. As a leading global consulting firm, our clients expect high quality deliverables in short periods of time, so a reliable research partner is essential. For the price that you have charged the quality of your services were exceptional. We look forward to continue our relationship with your team on future engagements....

This is with regards to your report on India PVC pipes and fitting market outlook industry outlook to 2019. This is a very well written report and accept my compliments on the same.... ...



Ken Research Pvt. Ltd. Unit 14, Tower B3, Spaze I Tech Business Park, Sohna Road, sector 49
     Gurgaon, Haryana - 122001, India

download

Company Brochure

Engage with Us

sales [@] kenresearch.com