Shopping Cart 0
Cart Subtotal
USD 0

Metal and Material Production and Processing plants (Construction) in Angola: Market Analytics by Category & Cost Type to 2021

Restricted to one authorized user; Open on 1 PC/ mobile / Tablet only.
Print Option: Yes
Copy Option: No
Deliverable Format : PDF Via Email

Single User License
USD 500

Restricted to one authorized user; Open on 1 PC/ mobile / Tablet only.
Print Option: Yes
Copy Option: No
Deliverable Format : PDF Via Email

Site License
USD 1000

Multiple Users within the Company/ Enterprise
Print Option: Yes
Copy Option: Yes
Deliverable Format : Excel, PDF Via Email

Corporate User License
USD 1500
  • Details
  • Table Of Content
  • Licence Rights
  • Section Purchase
  • Products and Companies

Details

Timetric's "Metal and Material Production and Processing plants (Construction) in Angola: Market Analytics by Category & Cost Type to 2021" contains historic and forecast market data for the metal and material production and processing plants category in Angola, it also provides detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services).

Summary

The metal and material processing plant category covers the development of facilities used in the refining of ores and raw materials, the production of base and precious metals and the production of basic metal components. The category includes, but is not limited to, aluminum plants, cement plants, foundries, furnaces, kilns, paper & pulp mills, smelters and steel mills.

The Angolan metal and material production and processing plants construction category has observed some fluctuations in the review period with a value of AOAxxx.xx million (US$xxx.xx million) in 2016 and increased at a rate of x.xx% over 2015. The market recorded a CAGR of x.xx% from 2012 through 2016.

"Metal and Material Production and Processing plants (Construction) in Angola: Market Analytics by Category & Cost Type to 2021" provides a top-level overview and detailed insight into the operating environment of the metal and material production and processing plants market in Angola. It is an essential tool for companies active across the Angola construction value chain and for new players considering to enter the market.

Scope

A top level overview of the metal and material production and processing plants construction category in Angola.

Historic data provided from 2012 through 2016 and forecast from 2017 through 2021.

A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment & construction services) across the metal and material production and processing plants market.

Reasons To Buy

Provides a top level understanding of the Metal and Material Production and Processing plants construction in Angola.

Helps you understand the market performance by construction activity (new construction, repair and maintenance, refurbishment and demolition) and construction cost type (construction materials, construction equipment & construction services).

Allows you to plan future business decisions using the forecast figures given.

The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.

READ MORE

Table Of Content

Scope

1 Introduction

1.1 What is this Report About?

1.2 Definitions

1.3 CAGR Definition and Calculation

2 Overall Metal and Material Production and Processing plants construction: Market Analysis

2.1 Overall Metal and Material Production and Processing plants construction Output Value, 2012-2016

2.2 Overall Metal and Material Production and Processing plants construction Output Value Forecast, 2017-2021

2.3 Overall Metal and Material Production and Processing plants construction Output, by Cost Type

2.3.1 Overall Metal and Material Production and Processing plants construction Output, by Cost Type, 2012-2016

2.3.2 Overall Metal and Material Production and Processing plants construction Output Forecast, by Cost Type, 2017-2021

3 Metal and Material Production and Processing plants construction Output: Analysis by Category

3.1 New Construction Output Value, 2012-2016

3.2 New Construction Output Value Forecast, 2017-2021

3.3 New Construction Output Value by Cost Type

3.3.1 New Construction Output, by Cost type, 2012-2016

3.3.2 New Construction Output Forecast, by Cost Type, 2017-2021

3.4 Repair & Maintenance Output Value, 2012-2016

3.5 Repair & Maintenance Output value Forecast, 2017-2021

3.6 Repair & Maintenance Output, by Cost Type

3.6.1 Repair & Maintenance Output, by Cost type, 2012-2016

3.6.2 Repair & Maintenance Output Forecast, by Cost Type, 2017-2021

3.7 Refurbishment Construction Output Value, 2012-2016

3.8 Refurbishment Construction Output Value Forecast, 2017-2021

3.9 Refurbishment Construction Output, by Cost Type

3.9.1 Refurbishment Construction Output, by Cost type, 2012-2016

3.9.2 Refurbishment Construction Output Forecast, by Cost type, 2017-2021

3.1 Demolition Construction Output Value, 2012-2016

3.11 Demolition Construction Output Value Forecast, 2017-2021

3.12 Demolition Construction Output, by Cost Type

3.12.1 Demolition Construction Output, by Cost type, 2012-2016

3.12.2 Demolition Construction Output Forecast, by Cost type, 2017-2021

4 Appendix

4.1 Summary Methodology

4.2 Exchange Rates

4.3 About Timetric

4.4 Timetric's Services

4.5 Disclaimer


List Of Figure

Figure 1: Angolan Overall Metal and Material Production and Processing plants construction Output Value (AOA Million), 2012-2016

Figure 2: Angolan Overall Metal and Material Production and Processing plants construction Output Value (AOA Million), 2017-2021

Figure 3: Angolan Overall Metal and Material Production and Processing plants construction Output, by Cost Type (AOA Million), 2012-2016

Figure 4: Angolan Overall Metal and Material Production and Processing plants construction Output, by Cost Type (AOA Million), 2017-2021

Figure 5: Angolan Metal and Material Production and Processing plants construction Output Value, New Construction (AOA Million), 2012-2016

Figure 6: Angolan Metal and Material Production and Processing plants construction Output Value, New Construction (AOA Million), 2017-2021

Figure 7: Angolan Metal and Material Production and Processing plants construction Output, New Construction by Cost Type (AOA Million), 2012-2016

Figure 8: Angolan Metal and Material Production and Processing plants construction Output, New Construction by Cost Type (AOA Million), 2017-2021

Figure 9: Angolan Metal and Material Production and Processing plants construction Output Value, Repair & Maintenance (AOA Million), 2012-2016

Figure 10: Angolan Metal and Material Production and Processing plants construction Output Value, Repair & Maintenance (AOA Million), 2017-2021

Figure 11: Angolan Metal and Material Production and Processing plants construction Output, Repair & Maintenance by Cost Type (AOA Million), 2012-2016

Figure 12: Angolan Metal and Material Production and Processing plants construction Output, Repair & Maintenance by Cost Type (AOA Million), 2017-2021

Figure 13: Angolan Metal and Material Production and Processing plants construction Output Value, Refurbishment (AOA Million), 2012-2016

Figure 14: Angolan Metal and Material Production and Processing plants construction Output Value, Refurbishment (AOA Million), 2017-2021

Figure 15: Angolan Metal and Material Production and Processing plants construction Output, Refurbishment by Cost Type (AOA Million), 2012-2016

Figure 16: Angolan Metal and Material Production and Processing plants construction Output, Refurbishment by Cost Type (AOA Million), 2017-2021

Figure 17: Angolan Metal and Material Production and Processing plants construction Output Value, Demolition (AOA Million), 2012-2016

Figure 18: Angolan Metal and Material Production and Processing plants construction Output Value, Demolition (AOA Million), 2017-2021

Figure 19: Angolan Metal and Material Production and Processing plants construction Output, Demolition by Cost Type (AOA Million), 2012-2016

Figure 20: Angolan Metal and Material Production and Processing plants construction Output, Demolition by Cost Type (AOA Million), 2017-2021


List Of Table

Table 1: Timetric- Metal and Material Production and Processing plants construction Market Definitions

Table 2: Angolan Overall Metal and Material Production and Processing plants construction Output Value (US$ Million), 2012-2016

Table 3: Angolan Overall Metal and Material Production and Processing plants construction Output Value (AOA Million), 2012-2016

Table 4: Angolan Overall Metal and Material Production and Processing plants construction Output Value (US$ Million), 2017-2021

Table 5: Angolan Overall Metal and Material Production and Processing plants construction Output Value (AOA Million), 2017-2021

Table 6: Angolan Overall Metal and Material Production and Processing plants construction Output, by Cost Type (US$ Million), 2012-2016

Table 7: Angolan Overall Metal and Material Production and Processing plants construction Output, by Cost Type (AOA Million), 2012-2016

Table 8: Angolan Overall Metal and Material Production and Processing plants construction Output, by Cost Type (US$ Million), 2017-2021

Table 9: Angolan Overall Metal and Material Production and Processing plants construction Output, by Cost Type (AOA Million), 2017-2021

Table 10: Angolan Metal and Material Production and Processing plants construction Output Value, New Construction (US$ Million), 2012-2016

Table 11: Angolan Metal and Material Production and Processing plants construction Output Value, New Construction (AOA Million), 2012-2016

Table 12: Angolan Metal and Material Production and Processing plants construction Output Value, New Construction (US$ Million), 2017-2021

Table 13: Angolan Metal and Material Production and Processing plants construction Output Value, New Construction (AOA Million), 2017-2021

Table 14: Angolan Metal and Material Production and Processing plants construction Output, New Construction by Cost Type (US$ Million), 2012-2016

Table 15: Angolan Metal and Material Production and Processing plants construction Output, New Construction by Cost Type (AOA Million), 2012-2016

Table 16: Angolan Metal and Material Production and Processing plants construction Output, New Construction by Cost Type (US$ Million), 2017-2021

Table 17: Angolan Metal and Material Production and Processing plants construction Output, New Construction by Cost Type (AOA Million), 2017-2021

Table 18: Angolan Metal and Material Production and Processing plants construction Output Value, Repair & Maintenance (US$ Million), 2012-2016

Table 19: Angolan Metal and Material Production and Processing plants construction Output Value, Repair & Maintenance (AOA Million), 2012-2016

Table 20: Angolan Metal and Material Production and Processing plants construction Output Value, Repair & Maintenance (US$ Million), 2017-2021

Table 21: Angolan Metal and Material Production and Processing plants construction Output Value, Repair & Maintenance (AOA Million), 2017-2021

Table 22: Angolan Metal and Material Production and Processing plants construction Output, Repair & Maintenance by Cost Type(US$ Million), 2012-2016

Table 23: Angolan Metal and Material Production and Processing plants construction Output, Repair & Maintenance by Cost Type (AOA Million), 2012-2016

Table 24: Angolan Metal and Material Production and Processing plants construction Output, Repair & Maintenance by Cost Type (US$ Million), 2017-2021

Table 25: Angolan Metal and Material Production and Processing plants construction Output, Repair & Maintenance by Cost Type (AOA Million), 2017-2021

Table 26: Angolan Metal and Material Production and Processing plants construction Output Value, Refurbishment (US$ Million), 2012-2016

Table 27: Angolan Metal and Material Production and Processing plants construction Output Value, Refurbishment (AOA Million), 2012-2016

Table 28: Angolan Metal and Material Production and Processing plants construction Output Value, Refurbishment (US$ Million), 2017-2021

Table 29: Angolan Metal and Material Production and Processing plants construction Output Value, Refurbishment (AOA Million), 2017-2021

Table 30: Angolan Metal and Material Production and Processing plants construction Output, Refurbishment by Cost Type (US$ Million), 2012-2016

Table 31: Angolan Metal and Material Production and Processing plants construction Output, Refurbishment by Cost Type (AOA Million), 2012-2016

Table 32: Angolan Metal and Material Production and Processing plants construction Output, Refurbishment by Cost Type (US$ Million), 2017-2021

Table 33: Angolan Metal and Material Production and Processing plants construction Output, Refurbishment by Cost Type (AOA Million), 2017-2021

Table 34: Angolan Metal and Material Production and Processing plants construction Output Value, Demolition (US$ Million), 2012-2016

Table 35: Angolan Metal and Material Production and Processing plants construction Output Value, Demolition (AOA Million), 2012-2016

Table 36: Angolan Metal and Material Production and Processing plants construction Output Value, Demolition (US$ Million), 2017-2021

Table 37: Angolan Metal and Material Production and Processing plants construction Output Value, Demolition (AOA Million), 2017-2021

Table 38: Angolan Metal and Material Production and Processing plants construction Output, Demolition by Cost Type (US$ Million), 2012-2016

Table 39: Angolan Metal and Material Production and Processing plants construction Output, Demolition by Cost Type (AOA Million), 2012-2016

Table 40: Angolan Metal and Material Production and Processing plants construction Output, Demolition by Cost Type (US$ Million), 2017-2021

Table 41: Angolan Metal and Material Production and Processing plants construction Output, Demolition by Cost Type (AOA Million), 2017-2021

Table 42: Angolan Exchange Rate (Annual Average), 2012-2016

Table 43: Angolan Exchange Rate (Annual Average), 2017-2021 Forecast

Licence Rights

Section Purchase

To know more information on Purchase by Section, please send a mail to support@kenresearch.com

Products and Companies

Products

Angola, databook, construction, industrial construction, market value, activities, cost type, historic, forecast, segment, category, new construction, repair and maintenance, refurbishment and demolition, construction materials, construction equipment and construction services