In the Bridge and Tunnel Construction sector, tightening carbon-accounting requirements are reshaping design engineering, materials procurement, and on-site execution as we recalibrate project workflows, heightening the need for traceable inputs and disciplined sequencing to prevent rework and schedule slippage.